Delays
Delays contract clause examples
Previous results

an additional 30 days of extension on account of Force Majeure delays occasioned by the COVID-19 pandemic in the aggregate) and Tenant Delays), then Tenant shall receive an additional credit of one (1) days’ free Base Rent (such that Tenant is receiving a total of two (2) day’s free Base Rent for each day of delay after the 120th day until the Premises are Ready for Occupancy. If the Premises are not Ready for Occupancy within two hundred ten (210) days of the Anticipated Lease Commencement Date (the “Third Outside Date”) (as such Third Outside Date may be extended on a day per day basis due to any Force Majeure Delays (up to a maximum of 50 days of extension on account of Force Majeure delays in the aggregate and an additional 30 days of extension on account of Force Majeure delays occasioned by the COVID-19 pandemic in the aggregate) and Tenant Delays), then this Lease may be terminated by Tenant by written notice to Landlord, and if so terminated # the Letter of Credit or Security Deposit (as applicable) and any amounts prepaid by Tenant to Landlord shall be returned by Landlord to Tenant within thirty (30) days of the termination, and # neither Landlord nor Tenant shall have any further rights, duties, or obligations under this Lease, except with respect to the provisions which express survive the expiration or termination of this Lease.

errors, omissions, interruptions or delays in transmission or delivery of any messages, by mail, cable, facsimile, telex or otherwise;

PASSENGER CARE DURING DELAYS: The contractor shall coordinate all aspects of delays to ensure adequate passenger care is provided. Airline representatives shall ensure all passengers are briefed on delay specifics; i.e. quarters, meal, and transportation provided and 24 hour contact information with specific times to either meet their transportation to return to the terminal or time to be present at the terminal for reprocessing.

Excusable Delay. Construction Force Majeure (as hereinafter defined) and/or Tenant Delay (as hereinafter defined) are collectively referred as “Excusable Delays”.

a) ​ if there are delays, in a month, greater than 20 seconds, in the response time, from 1 to 100 times.

Tenant Delays. A Tenant Delay shall not be deemed to have commenced until Landlord has provided written notice to Tenant that a Tenant Delay is occurring.

HQUS Delay” means delays in completing the Québec Line, whether due to operational difficulties or any other event that is not an event of Force Majeure.

Tenant's Covenants. Tenant hereby indemnifies Landlord for any loss, claims, damages or delays arising from the actions of Architect on the Premises or in the Building.

If Landlord shall be actually delayed in Substantially Completing the Landlord’s Work beyond the Intended Commencement Date as a result any of the following (collectively, “Tenant Delays”):

A x (Controllable Short Delays in such month / ((1 - Z) x Controllable Departures in such month) x ((Controllable Departures in such month x (Z – Monthly Historical Percentage))

Next results

Draft better contracts
faster with AllDrafts

AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.

And AllDrafts generates clean Word and PDF files from any draft.