Written Contingency Diversion System construction procedures are to be developed and posted near the diversion system materials storage location within 90 days of the Effective Date of this Settlement Agreement. Construction procedures shall provide sufficient detail for diversion system construction by all crew members. The construction procedures shall be periodically updated as needed. Purchaser shall provide the construction procedures to EPA upon request.
The diversion dam structure, location as described in Paragraph 29.c, and adjoining ditches, are to be kept serviceable and in operable condition at all times for diversion dam construction, operation, and maintenance.
In-Mine Diversion System Operation and Maintenance: Purchaser shall maintain and operate the In-Mine Diversion System until notification from EPA that the system may be decommissioned and removed, in accordance with the following:
In-Mine Diversion System Construction: Purchaser shall construct a diversion dam system in the Kellogg Tunnel just downstream from the Barney Switch which backs up all Mine Waters into the Barney Vent Raise or other appropriate and approved location. The system shall have the capability to divert a minimum of 7,000 gallons per minute.
your embezzlement or criminal diversion of funds or property of the Company or any of the Company’s subsidiaries;
which Administrative Agent determines is not subject to any Person’s right of reclamation, repudiation, diversion or stoppage in transit;
In-Mine Diversion System and Mine Pool. Purchaser shall construct an In-Mine Diversion System and manage the mine pool such that diverted flows of Mine Waters, as defined in Paragraph 29.a, will be stored within the mine or discharged at a controlled rate, and not result in uncontrolled discharge to the environment. The following criteria describe the performance criteria to be met.
Impossibility of Diversion of Trust Fund: Notwithstanding any provision herein to the contrary, no part of the corpus or the income of the Trust Fund shall ever be used for or diverted to purposes other than for the exclusive benefit of the Participants or their Beneficiaries or for the payment of expenses of the Plan. No part of the Trust Fund shall ever revert to the Employer.
Contingency Diversion System Materials: Sand bags or other materials that could be easily transported and assembled to route mine water back to the ditch in an emergency situation.
EPA may require an inspection of the In-Mine Diversion System following its initial construction pursuant to Paragraph 29(d)(1) to determine compliance with the requirements of Paragraph 29.
AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.
And AllDrafts generates clean Word and PDF files from any draft.