Contingency Diversion system procedures are to be periodically practiced, at least once per year, or more frequently as needed, to ensure the required diversion response times in Paragraph 30.c can be met. Purchaser shall inform EPA a minimum of 7 days prior to each Contingency Diversion System construction practice.
Diversion dam construction procedures and system operation and maintenance procedures required by Paragraph 29.e(5) shall be periodically practiced, at least once per year, or more frequently as needed to ensure the required diversion response time can be met. Purchaser shall inform EPA a minimum of 7 days prior to each diversion dam construction practice.
AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.
And AllDrafts generates clean Word and PDF files from any draft.