Written diversion dam construction procedures and In-Mine Diversion System operation and maintenance procedures are to be developed and posted near the diversion dam structure location within 70 days of the Effective Date of this Settlement Agreement which provide sufficient detail for diversion dam construction, and system operation and maintenance by all crew members. The written diversion dam construction procedures and system operation and maintenance procedures shall be periodically updated as needed. Purchaser shall provide the written procedures to EPA upon request.
Written Contingency Diversion System construction procedures are to be developed and posted near the diversion system materials storage location within 90 days of the Effective Date of this Settlement Agreement. Construction procedures shall provide sufficient detail for diversion system construction by all crew members. The construction procedures shall be periodically updated as needed. Purchaser shall provide the construction procedures to EPA upon request.
AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.
And AllDrafts generates clean Word and PDF files from any draft.