Example ContractsClauseshealthcare permitsVariants
Healthcare Permits
Healthcare Permits contract clause examples

Permits and Environmental Concerns. Seller will obtain and complete all requirements related to Storm Water Pollution Prevention Plans (“SWPPP”) as required by applicable local, state and federal authorities and maintain the same during the development of the lots within the Property. Upon Closing, Seller will deliver to Buyer satisfactory approval from the appropriate authority/agency regarding storm water quality that all BMP’s are installed and maintained per the SWPPP. Upon Closing, Seller shall transfer (to the extent transferrable) the stormwater permit to Buyer and Buyer shall assume all responsibility for future maintenance and installation and Seller shall be released from liability thereon. Seller shall have caused all FEMA requirements to have been met for a home on any lot to be exempted from purchasing flood insurance and no portion of any house pad site (it being understood that some portions of some lots are within a flood plain) is to be located in a FEMA defined flood plain. Seller’s principals have no actual knowledge that the Property has been or is presently used for handling, storage, manufacturing, refining, transportation or disposal of “toxic material”, “hazardous substances”, or “hazardous waste”. If “hazardous wastes”, “hazardous substances”, or “hazardous material” is located on the Property, as determined by a Phase I or permitted Phase II environmental assessment obtained by the Buyer, then Buyer shall have the right to terminate this Agreement during the Inspection Period pursuant to Paragraph 4 above.

Permits and Environmental Concerns. With the exception of the incomplete Post Closing Work defined below, Seller will obtain and complete all requirements related to Storm Water Pollution Prevention Plans (“SWPPP”) as required by applicable local, state and federal authorities and maintain the same during the development of the lots within the Property. Upon Closing, Seller will deliver to Buyer Seller’s most recent reports from its compliance inspector regarding storm water quality that all BMP’s are installed and maintained per the SWPPP. Upon Closing, Seller will close out its storm water permit for the Property and Buyer shall assume all responsibility for future maintenance and installation and Seller shall be released from liability thereon. Seller shall have caused all FEMA requirements to have been met for a home on any lot to be exempted from purchasing flood insurance and no portion of any house pad site (it being understood that some portions of some lots are within a flood plain) is to be located in a FEMA defined flood plain. Seller’s principals have no actual knowledge that the Property has been or is presently used for handling, storage, manufacturing, refining, transportation or disposal of “toxic material”, “hazardous substances”, or “hazardous waste”. If “hazardous wastes”, “hazardous substances”, or “hazardous material” is located on the Property, as determined by a Phase I or permitted Phase II environmental assessment obtained by the Buyer, then Buyer shall have the right to terminate this Agreement during the Pre-Closing Period pursuant to Paragraph 4 above. Without diminishing the obligations still to be performed by Seller hereunder, Buyer otherwise acknowledges Seller’s delivery of the Property in compliance with this Paragraph.

Draft better contracts
faster with AllDrafts

AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.

And AllDrafts generates clean Word and PDF files from any draft.