Immediately prior to delivery of the Substantial Completion Certificate for the Tenant Improvements, Project Manager or other representatives of Landlord shall conduct one or more "walkthroughs" of the Building with Tenant and Tenant's representatives, to identify any items of Punch List Work that may require correction and to prepare a joint punch list reflecting any such items, following which Landlord shall diligently complete the Punch List Work reflected in such joint punch list. The Punch List Work shall be attached to the Substantial Completion Certificate, and shall not include damage caused by Tenant or any of Tenant's agents in connection with any work performed by Tenant in the Premises, or required as a result of Tenant's move-in to the Premises. At any time within thirty (30) days after delivery of such Substantial Completion Certificate, Tenant shall be entitled to submit one or more lists to Landlord supplementing such joint punch list by specifying any additional items of Punch List Work to be performed on the applicable Tenant Improvements and Landlord's Work, and upon receipt of such list(s), Landlord shall diligently complete such additional Punch List Work. Promptly after Landlord provides Tenant with the Substantial Completion Certificate and completes all applicable Punch List Work for the Building, Landlord shall cause the recordation of a Notice of Completion (as defined in the California Civil Code) with respect to the Tenant Improvements.
Immediately priorConstruction Documents, with the exception of any # punch list items, the lack of completion of which, and the work of completion of which, will not impair ’s ability to deliveryinstall its fixtures, work-stations, built-in furniture or equipment in the Premises or otherwise conduct ’s normal business operations within the Premises, and # the installation of any fixtures, work-stations, built-in furniture, or equipment to be installed by . Upon the Substantial Completion Certificate for the Tenant Improvements, Project Manager or other representatives of Landlord shall conduct one or more "walkthroughs" of the Building with TenantImprovements, and Tenant's representatives, to identify any shall jointly conduct a walk-through of the Improvements and shall jointly prepare such a punch list (the “Punch List”) of items of Punch’s Work and Improvement needing additional work (the “Punch List Work that may require correction and to prepare a joint punch list reflecting any such items, following which Landlord shall diligently completeItems”); provided, however, the Punch List Work reflected in such joint punch list. Theshall be limited to items which are required by the Construction Documents and any other changes agreed to by the parties, and shall use commercially reasonably efforts to cause the same to be completed and/or corrected within the first thirty (30) days following the preparation of the Punch List. Within sixty (60) days following completion of the Punch List work, shall deliver to (or shall cause the Architect and the Contractors to deliver to ) a complete set of the “as-built” drawings for the ’s Work shall be attachedand the Improvements and a copy of each Contractor’s “close-out package” (all closed permits, all warranties, guaranties, and equipment specifications, operating manuals, maintenance requirements and other information relating to the Substantial Completion Certificate,improvements, equipment, and shall not include damage caused by Tenant or any of Tenant's agents in connection with any work performed by Tenantsystems in the Premises, or required as a result of Tenant's move-in to the Premises. At any time within thirty (30) days after delivery of such Substantial Completion Certificate, Tenant shall be entitled to submit one or more lists to Landlord supplementing such joint punch list by specifying any additional items of Punch List Work to be performed on the applicable Tenant Improvements and Landlord's Work, and upon receipt of such list(s), Landlord shall diligently complete such additional Punch List Work. Promptly after Landlord provides Tenant with the Substantial Completion Certificate and completes all applicable Punch List Work for the Building, Landlord shall cause the recordation of a Notice of Completion (as defined in the California Civil Code) with respect to the Tenant Improvements.etc.).
Immediately prior to delivery of the Substantial Completion Certificate for the Tenant Improvements, Project Manager or other representatives of Landlord shall conduct one or more "walkthroughs" of the Building with Tenant and Tenant'Landlords representatives, to identify any items of Punch List Work that may require correction and to prepare a joint punch list reflecting any such items, following which Landlord shall diligently complete the Punch List Work reflected in such joint punch list. The Punch List Work shall be attacheddeemed to be substantially completed notwithstanding that minor or non-material details of construction, mechanical adjustment or decorations remain to be performed (collectively, the Substantial Completion Certificate, and shall not include damage caused by Tenant or any of Tenant's agents in connection with any work performed by Tenant in the Premises, or required as a result of Tenant's move-in to the Premises. At any timePunch List Items). Landlord hereby agrees that within thirty (30) days after deliveryLandlords receipt of such Substantial Completion Certificate,a written notice from Tenant shall be entitled to submit one or more lists to Landlord supplementing such joint punch list by specifyingidentifying any additional items ofpurported Punch List Work to be performed on the applicable Tenant Improvements and Landlord'Items that require Landlords Work, and upon receipt of such list(s),completion, Landlord shall diligently complete such additionalsaid Punch List Work. Promptly after Landlord provides Tenant with the Substantial Completion Certificate and completes all applicable Punch List Work for the Building, Landlord shall cause the recordation of a Notice of Completion (as defined in the California Civil Code) with respect to the Tenant Improvements.Items.
AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.
And AllDrafts generates clean Word and PDF files from any draft.