Delay
Delay contract clause examples

Delay. No failure or delay on the part of any party in exercising any right, power or remedy hereunder shall operate as a waiver thereof, nor shall any single or partial exercise of any such right, power or remedy preclude any other or further exercise thereof or the exercise of any other right, power or remedy. The remedies provided for herein are cumulative and are not exclusive of any remedies that may be available to a party at law or in equity or otherwise.

Delay. If Landlord, for any reason whatsoever, cannot deliver possession of the Leased Premises to Tenant by the estimated Delivery Date, this Lease shall not be void or voidable, nor shall Landlord be liable for any loss or damage resulting therefrom except as expressly provided to the contrary in in this Section 4.4. If Delivery Date for the Leased Premises has not occurred by September 1, 2020 (the “Outside Date”) due to any Existing Tenant not have vacated and surrendered possession of the portion of the Leased Premises leased by an Existing Tenant, then (a) Landlord agrees to commence an unlawful detainer proceeding against such Existing Tenant to recover possession of the applicable portion of the Leased Premises, and (b) Tenant will be entitled, as its sole and exclusive remedy, to one (1) day of credit for Minimum Monthly Rent for the Leased Premises for every one (1) day of delay beyond the Outside Date until the Leased Premises is delivered to Tenant (the “Delay Credit”). The Delay Credit shall be applicable against Minimum Monthly Rent first coming due from and after the date for commencement of payment of Minimum Monthly Rent for the Leased Premises. The right to the Delay Credit will not be applicable if the Landlord does not deliver possession of the Leased Premises (or portion thereof) due to any casualty to the Leased Premises or the Building that causes a delay in Landlord delivering the Leased Premises to Tenant.

Delay. No failure or delay on the part of any party in exercising any right, power or remedy hereunder shall operate as a waiver thereof, nor shall any single or partial exercise of any such right, power or remedy preclude any other or further exercise thereof or the exercise of any other right, power or remedy. The remedies provided for herein are cumulative and are not exclusive of any remedies that may be available to a party at law or in equity or otherwise.

Delay") as a result of (a) any failure of Tenant to approve the Construction Pricing Proposal pursuant to Section 2.6.1 above on or before Tenant's Approval Deadline; (b) any failure of Tenant to timely approve the Engineering Drawings for any reason other than their failure to satisfy the Engineering Requirements; (c) any failure of Tenant to timely approve any other matter requiring Tenant's approval;

Delay. No delay or omission on Agent’s or any Lender’s part in exercising any right, remedy or option shall operate as a waiver of such or any other right, remedy or option or of any Default or Event of Default.

Delay. No failure or delay on the part of any party in exercising any right, power or remedy hereunder shall operate as a waiver thereof, nor shall any single or partial exercise of any such right, power or remedy preclude any other or further exercise thereof or the exercise of any other right, power or remedy. The remedies provided for herein are cumulative and are not exclusive of any remedies that may be available to a party at law or in equity or otherwise.

Delay” has the meaning given to it in clause 14.1.1;

Delay. No failure or delay on the part of any Party in exercising any right, power, or remedy hereunder shall operate as a waiver thereof, nor shall any single or partial exercise of any such right, power, or remedy preclude any other or further exercise thereof or the exercise of any right, power, or remedy. The remedies provided for herein are cumulative and are not exclusive of any remedies that may be available to a Party at Law or in equity or otherwise.

Delay i n Possession. Notwithstanding the Estimated Commencement Date specified in Section 1.10, if for any reason Landlord cannot deliver possession of the Premises to Tenant on said date or any other date with the Landlord’s Work complete as required in the Addendum, Landlord shall not be subject to any liability therefor, nor shall such failure affect the validity of this Lease or the obligations of Tenant hereunder; provided, however, in such a case, Tenant shall not be obligated to pay rent or perform any other obligation of Tenant under this Lease, except as may be otherwise provided in this Lease, until possession of the Premises is tendered to Tenant, as defined in Section 3.4. If Landlord shall not have tendered possession of the Premises to Tenant within sixty (60) days following the Estimated Commencement Date specified in Section 1.10, as the same may be adjusted in accordance with this Section 3.2 or Section 3.3 in the condition required by the Addendum, Tenant may, at Tenant’s option, by notice in writing to Landlord within ten (10) days after the expiration of the sixty (60) day period, terminate this Lease. If Tenant terminates this Lease as provided in the preceding sentence, the parties shall be discharged from all obligations hereunder, except that Landlord shall return any money previously deposited with Landlord by Tenant; and provided further , that if such written notice by Tenant is not received by Landlord within said ten (10) day period, Tenant shall not have the right to terminate this Lease as provided above unless Landlord fails to tender possession of the Premises to Tenant within one hundred twenty (120) days following the Estimated Commencement Date specified in Section 1.10, as the same may be adjusted in accordance with this Section 3.2 or Section 3.3 or in accordance with the Addendum attached to this Lease. If Landlord is unable to deliver possession of the Premises to Tenant on the Estimated Commencement Date specified in Section 1.10, as the same may be adjusted in accordance with this Section 3.2 or Section 3.3 or in accordance with the Addendum, due to a Force Majeure Event (as defined below), such estimated Commencement Date shall be extended by the period of the delay caused by the Force Majeure Event, not to exceed an additional thirty (30) days. A “Force Majeure Event” shall mean fire, earthquake, weather delays or other acts of God, strikes, boycotts, war, riot, insurrection, embargoes, shortages of equipment, labor or materials, delays in issuance of governmental permits or approvals, or any other cause beyond the reasonable control of Landlord.

Delay. No delay or omission on Agent’s or any Lender’s part in exercising any right, remedy or option shall operate as a waiver of such or any other right, remedy or option or of any Default or Event of Default.

Next results

Draft better contracts
faster with AllDrafts

AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.

And AllDrafts generates clean Word and PDF files from any draft.