Planned Capacity means operation of the Production Facility utilizing [ ] Components and [ ] Components, in each case, operating at [ ] of full-capacity twenty-four (24) hours per day (i.e., three (3) shifts), five (5) days per week and fifty (50) weeks per year. By way of example, it is estimated that [ ] of Planned Capacity shall equal 180 sets of [ ] Components and 125 sets of [ ] Components. For avoidance of doubt, reference to Planned Capacity for [ ] Components and for the [ ] Components shall mean [ ] such Component operating as set forth in the preceding sentence.
Planned Capacity means operation of the Production Facility at the following utilization level: [......] production lines operating at [......] of full-capacity twenty-four (24) hours per day (i.e., three (3) shifts), five (5) days per week and fifty (50 weeks per year, prorated for 2008 production year does not include a full twelve (12) months following the Full Commercial Operation Date.
AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.
And AllDrafts generates clean Word and PDF files from any draft.