Completion/Compliance. The Property and lots therein have been completed in full compliance with all terms hereof. All requirements by applicable local, state and federal governmental authorities will have been met or exceeded for the Property and each lot therein, including but not limited to, preliminary and final plat approval, proper construction and availability of fully operational utilities including roads, water, sanitary sewer, storm, sewer with all necessary permits and fully compliant (no violations) with all applicable rules, regulations, and ordinances of applicable authorities, and a written statement from the engineer of record that building permits are obtainable from the appropriate governmental agencies for the construction of single-family houses on the lots. A preliminary and final plat of the development, approved construction drawings from the municipal authority and an “AS BUILT” survey will be provided in “PDF” and “CAD” format to the Buyer as they become available. Each lot pin shall have a flagged wooden lathe to mark the pin location. Provided that Buyer provides Seller adequate and appropriate utility easements over and under the Property, as reasonably determined by Seller, Seller will cause permanent underground electric power and telecommunication facilities (collectively, the “Permanent Utilities”) to be installed and available to the perimeter of each lot within the Property within ninety (90) days after Buyer has poured the slab for a residence on a lot and has given Seller written notice that Buyer is ready for the Permanent Utilities for the lot. This post-closing obligation of Seller to provide Permanent Utilities shall expressly survive Closing for twenty-four (24) months.
Completion/Compliance. With the exception of the incomplete Post Closing Work defined below, the Property and lots therein, including all work and Post Closing Work performed by Seller as of Closing, have been completed in full compliance with all terms hereof. All requirements by applicable local, state and federal governmental authorities, as certified by a certified professional engineer, will have been met or exceeded for the Property and each lot therein, including but not limited to, preliminary and final plat approval, proper construction and availability of fully operational utilities including roads, water, sanitary sewer, storm, sewer with all necessary permits and fully compliant (no violations) with all applicable rules, regulations, and ordinances of applicable authorities, and a written statement from the engineer of record that building permits are obtainable from the appropriate governmental agencies for the construction of single-family houses on the lots. A preliminary and final plat of the development, approved construction drawings from the municipal authority and an “AS BUILT” survey will be provided in “PDF” and “CAD” format to the Buyer as they become available. Each lot pin shall have a flagged wooden lathe to mark the pin location. Provided that Buyer provides Seller adequate and appropriate utility easements over and under the Property and has graded the Property and staked all of the lots in the Property, all as reasonably determined by Seller, Seller will cause permanent underground electric power and telecommunication facilities (collectively, the “Permanent Utilities”) to be installed and available to the perimeter of each lot within the Property within ninety (90) days after Buyer has poured the slab for a residence on a lot and has given Seller written notice that Buyer is ready for the Permanent Utilities for the lot. This post-Closing obligation of Seller for Permanent Utilities shall be performed at Seller’s expense and shall expressly survive Closing for twenty-four (24) months and shall not merge into the deed or Closing.
AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.
And AllDrafts generates clean Word and PDF files from any draft.