Approved Equipment. Projects with any Major Equipment not manufactured by an Approved Manufacturer do not exceed 15 () of the STC DC nameplate MW of all Borrower Projects.
Approved Equipment. Projects with any Major Equipment not manufactured by an Approved Manufacturer do not exceed 16 () of the STC DC nameplate MW of all Borrower Projects.
Approved Equipment. Projects with any Major Equipment not manufactured by an Approved Manufacturer do not exceed () of the STC DC nameplate MW of all Borrower Projects.
AllDrafts is a cloud-based editor designed specifically for contracts. With automatic formatting, a massive clause library, smart redaction, and insanely easy templates, it’s a welcome change from Word.
And AllDrafts generates clean Word and PDF files from any draft.